Client: U.S. Coast Guard
CEU Miami
Contract #: HSCG82-10-D-PMVA36
Contract Amount: $786,868
Project required demolition and replacement of existing Aids to Navigation (ATON) structures. Engineering Design, In-House Fabrication, and installation of two new ATON structures at Matagorda Ship Channel and Colorado River West Jetty entrance. Driven pipe piles, cast-inplace concrete, metal fabrication, and coatings. Solar panels and electrical installation.